Recent Planning Applications

Stratford Bridge Garage Stratford Bridge Ripple Tewkesbury Gloucestershire GL20 6HE

20th September 2024

Application for approval of details subject to Condition 11 (commencement of the remediation scheme works), of planning application 20/01038/FUL

Three Counties Equine Hospital Llp Stratford Bridge Ripple Tewkesbury GL20 6HE

25th July 2024

Siting of portable classroom and associated hardstanding

Swallowfields Naunton Upton Upon Severn Worcester WR8 0PY

24th June 2024

Proposed replacement front elevation porch plus 2No. Front elevation velux windows

Ripple Parish Hall School Lane Ripple Tewkesbury GL20 6EU

29th April 2024

Notification for Prior Approval for the proposed change of use of land from agricultural to community leisure space

47 The Beeches Holly Green Upton Upon Severn Worcester WR8 0QQ

11th April 2024

(Retrospective) First floor extension over garage to create an ensuite shower room.

Ryall Court Farm Ryall Court Lane Holly Green Upton Upon Severn Worcester WR8 0PF

9th January 2024

Remove 4m hedge to facilitate new culvert crossing.

Grove Cottage Ryall Grove Upton Upon Severn Worcester WR8 0PL

20th December 2023

Single storey rear extension (part replacement)

Ryall House Farm Quarry Tewkesbury Road Upton Upon Severn Worcester WR8 0PU

15th December 2023

County Matters consultation by WCC - Carrying out of development pursuant to planning permission 15/000012/CM (15/00440/COM) dated 23 May 2016 without complying with condition 12 of that permission, so as to enable the continued temporary retention of aggr

Wells Furlong Uckinghall Tewkesbury GL20 6ES

12th December 2023

Two-storey and single-storey rear extensions to existing detached dwelling

Ryall Cottage Ryall Lane Ryall Upton Upon Severn Worcester WR8 0PN

20th November 2023

Detached oak framed carport including solar panels to roof

Cobwalls Uckinghall Tewkesbury GL20 6ES

31st October 2023

Replacement of 7 windows and one set of French doors.

Ryall Court Farm Ryall Court Lane Holly Green Upton Upon Severn Worcester WR8 0PF

10th October 2023

Proposed Agricultural Worker's Dwelling as approved under planning reference 12/01673/FUL - Variation of conditions 8 and 11.

Three Counties Equine Hospital Llp Stratford Bridge Ripple Tewkesbury GL20 6HE

2nd October 2023

Erection of a log cabin (to be used as a staff room) on concrete base.

Chandos Strensham Road Ryall Grove Upton Upon Severn Worcester WR8 0PS

30th August 2023

Installation of underground LPG tank, to be sited in the front garden of the property.

The Cottage Naunton Upton Upon Severn Worcester WR8 0PZ

29th August 2023

Single and two storey extensions

Ripple Cottage The Cross Ripple Tewkesbury GL20 6EZ

24th July 2023

Full restoration and repair including re-roofing, replacement windows, doors and ground floor; internal layout alterations; rear two-storey extension - (Variation of Condition 8 on planning permission M/22/01533/HP to change wording 'use of bitumous fe

Three Counties Equine Hospital Llp Stratford Bridge Ripple Tewkesbury GL20 6HE

28th June 2023

Proposed construction of detached isolation stable building, hardstandings and access track.

Green Street Farm Strensham Road Naunton Upton Upon Severn Worcester WR8 0QA

15th May 2023

Installation of 12 arena lights, erection of 2 field shelters and all weather turnout area (retrospective)

5 Court Lea Holly Green Upton Upon Severn Worcester WR8 0PE

23rd March 2023

Proposed side extensions, loft conversion and porch. North east side extension to include garaging with additional accommodation to the rear and above

Brockeridge Common Brockeridge Road Twyning Tewkesbury Gloucestershire GL20 6HE

14th February 2023

Creation of new access to Brockeridge common off A38 Tewkesbury Road

The Stables Station Road Ripple Tewkesbury GL20 6EY

17th January 2023

Replacement of greenhouse and chicken coop with agricultural shed (retrospective)

Surmans Farm Ryall Court Lane Holly Green Upton Upon Severn Worcester WR8 0PF

21st December 2022

Prior Approval Application for an internal access track on agricultural land

Vine Tree House Uckinghall Tewkesbury GL20 6ES

29th November 2022

Proposed two-storey rear extension with internal and external alterations

Ripple Cottage The Cross Ripple Tewkesbury GL20 6EZ

16th November 2022

Full restoration and repair, including re-roofing, replacement windows, doors and ground floor. Internal layout alterations. Rear two-storey extension.

Ripple Cottage The Cross Ripple Tewkesbury GL20 6EZ

16th November 2022

Full restoration and repair, including re-roofing, replacement windows, doors and ground floor. Internal layout alterations. Rear two-storey extension.